Cement that is lost to the formation, called lost circulation, can be an issue before, during and after cementing in some parts of the world. We design and pump speciality slurries and systems for drilling that resolve lost circulation challenges. Our technical team has developed a number of unique systems for resolving lost circulation during and after cementing, and proprietary cement blends that reduce hydrostatic pressure to obtain the required annular wellbore height.